Skip to content

Timeline

⭐ = Milestone

By date

Date Next date
🟩 in use MinK8s 2026-07-24 works, we can use it to simply setup minimal a testcluster
Being Part of running testsetups
🔵 in Erprobung Beispielseite — alle Frontmatter-Felder 2026-07-21 2026-09-01 freier Zusatztext — erscheint als Zeile in der Status-Box
Beispiel für den nächsten Schritt — dieser Text erscheint in der Admonition
🚧 draft Daily transfer toggle test 2026-07-21 Started Daily Transfer Demo Workload
🚧 draft Datenkuratierung für lokale Edge KI Workstations 2026-07-20 2026-07-28 Demand from a research group at a north bavarian univ. of apllied Science. Discussing with
confirmed Current description of scope 2026-07-20 current – scope refined due to project progress
🔵 Active in daily dev and test Production via gitops only 2026-05-26 2026-08-03 In kube3-project considered as design goal and state of the art.
Use and learn in daily dev operations
🟩 stable Meilenstein 1 — Erfüllungsbericht — M1 – Erfüllungsbericht 2026-05-26 Mai 2026
in gemeinsamen Zwischenbericht enthalten
🔵 first-real-tests Scenario 1 Syncthing 3 -Node 2026-05-19 dvelopping tests with real data
⏳ paused Kube3 Testbed 2026-05-19 2026-08-01 test if available
🟢 tested Syncthing — Overview 2026-05-16 syncthing seems to be for a long time very mature in operations. Seems to have good paths looking architecutral and technical aspects
🔵 first-test Syncthing — Encrypted Relay Node 2026-05-16 long term testing, seems to work
🔵 first-test Syncthing — Hot Spare / Secondary Node 2026-05-16 currently in  testing with real data
🔵 first-test Syncthing — Config Backup 2026-05-16 included in Daily Transfer Test id_tf5-7hp1
✅ erledigt Ask People ... 2026-04-01 interviewed people with running instances from different universities, users, it-department stuff, largescale providers
paused Cluster RRZE 2026-03-05 tried transfer as failover for lrz cluster
waiting
🟩 stable Cluster LRZ 2026-02-05 Testing customer workloads started
✅ done Kickoff Workshop wih B1 2025 about architecture 2025-11-01 interviewed people with running instances from different universities, users, it-department staff, largescale providers

By status

🔵 Active in daily dev and test

Date Next date
Production via gitops only 2026-05-26 2026-08-03 In kube3-project considered as design goal and state of the art.
Use and learn in daily dev operations

confirmed

Date Next date
Current description of scope 2026-07-20 current – scope refined due to project progress

✅ done

Date Next date
Kickoff Workshop wih B1 2025 about architecture 2025-11-01 interviewed people with running instances from different universities, users, it-department staff, largescale providers

🚧 draft

Date Next date
Datenkuratierung für lokale Edge KI Workstations 2026-07-20 2026-07-28 Demand from a research group at a north bavarian univ. of apllied Science. Discussing with
Daily transfer toggle test 2026-07-21 Started Daily Transfer Demo Workload

✅ erledigt

Date Next date
Ask People ... 2026-04-01 interviewed people with running instances from different universities, users, it-department stuff, largescale providers

🔵 first-real-tests

Date Next date
Scenario 1 Syncthing 3 -Node 2026-05-19 dvelopping tests with real data

🔵 first-test

Date Next date
Syncthing — Encrypted Relay Node 2026-05-16 long term testing, seems to work
Syncthing — Hot Spare / Secondary Node 2026-05-16 currently in  testing with real data
Syncthing — Config Backup 2026-05-16 included in Daily Transfer Test id_tf5-7hp1

🔵 in Erprobung

Date Next date
Beispielseite — alle Frontmatter-Felder 2026-07-21 2026-09-01 freier Zusatztext — erscheint als Zeile in der Status-Box
Beispiel für den nächsten Schritt — dieser Text erscheint in der Admonition

🟩 in use

Date Next date
MinK8s 2026-07-24 works, we can use it to simply setup minimal a testcluster
Being Part of running testsetups

paused

Date Next date
Cluster RRZE 2026-03-05 tried transfer as failover for lrz cluster
waiting
Kube3 Testbed 2026-05-19 2026-08-01 test if available

🟩 stable

Date Next date
Cluster LRZ 2026-02-05 Testing customer workloads started
Meilenstein 1 — Erfüllungsbericht 2026-05-26 Mai 2026
in gemeinsamen Zwischenbericht enthalten

🟢 tested

Date Next date
Syncthing — Overview 2026-05-16 syncthing seems to be for a long time very mature in operations. Seems to have good paths looking architecutral and technical aspects

Status legend

Values are free text EMOJI word — the emoji sets the color. Recommended:

Status Meaning
🚧 draft draft, content incomplete
🔵 first-test first run done, not all scenarios covered
🟢 tested all planned scenarios verified
🟩 stable confirmed across environments/time
⏳ paused paused / waiting (incl. external)
🟠 at risk might fail
🟥 misplanned planning turned out wrong
❌ discarded discarded / abandoned
✅ done completed one-off event (e.g. workshop)
❓ unclear unclear, assessment open

Entries keep their timeline/milestone row regardless of status — even 🟠 at risk, 🟥 misplanned or ❌ discarded; only removing visibility takes a page off the site.


← How to Test a Scenario

tfamue · v2026-05-19 · Export created: 2026-07-28 12:15 UTC